AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Lumen cleveland apartments11/19/2023 For-sale housing is a critical need Downtown as there are very few options for home-buyers, at only 5% of all Downtown housing options. However, we are including this project of only 14 units because of its importance. We would otherwise have a large and unwieldily list. Status: Construction planned to start soon with completion targeted for early 2024.Įditorial Note: Projects listed on this page are generally larger projects, and for residential investments, we have used 20 or more market-rate units as the minimum for inclusion. The floors are currently office floors that will be converted. ĭescription: New condominiums to be constructed on Floors 15 and 17 of 629 Euclid Ave, an existing building that currently houses offices, apartments, and a Holiday Inn Express. Sherwin Williams’ official site on the construction can be found here. 69-page Schematic design packet submitted to the city (8/31/21) is here. 39-page Concept design packet submitted to the city (7/1/21) is here. Legal and economic development counsel: Vorys, Sater, Seymour and Pease LLP Real estate and economic development advisor: CBRE Inc Project manager, project controls, and owner’s representative: Mark G. Final design submission submitted 11/16/21 for 11/30/21 meeting.Įstimated Completion: Late 2024 (originally set for early 2023, but delayed because of Covid-19).Ĭost: $600M including the cost of a R&D center at a separate location.ĭesign architect: Pickard Chilton Architects, Inc.īase building architect: HGA Architects and Engineers, LLCĬonstruction manager: Welty Gilbane (a partnership of Welty-Testa Builders, LLC and Gilbane Building Co.) Schematic designs submitted 8/31/21, with meeting set for 9/14/21. 7/20/21: Meeting with the City on the concept submission. July 1, 2021, concept plans submitted to the City for approval. High-level site plan released on Feb 19, 2021. Most project activities were paused in April due to the global pandemic, however the project is moving forward at the original scale (with no reductions for remote working). Status: Under construction: groundbreaking ceremony held on December 15, 2021. Use: Office / Corporate Headquarters, parkingĪddress: Public Square (NW Quadrant) and W 3 St between St. 3 and Frankfort would accommodate 920 spaces over five levels-one below grade, four at and above grade. Additionally: a two-story “Pavilion” hosting a “Center of Excellence” facing the NW quadrant of Public Square to be included. To be 36 stories to accommodate 3,000+ employees, and 616 feet tall. 1 million square feet at the northwest corner of Superior Ave. Scroll through or use the links below to jump.ĭescription: Global corporate headquarters. If you think we missed something significant, or if a listed project needs an update, please let us know. Otherwise, this list would be unmanageable with hundreds of projects. Moreover, given the large number of residential projects, only market-rate projects and those of 20 or more units are included. Additionally, we do include some renovation projects, such as office-to-residential or office-to-hotel conversions, as the change of building use can have meaningful economic impacts. A few smaller projects are listed as they will have transformative physical or significant economic impacts, or the potential for such. While there are numerous renovation projects underway or planned, we generally list only new construction and mostly only major projects. Note that many plans were delayed by Covid-19, pushing projects back by a year or two. This page provides a summary of the various major projects recently announced, in design/construction, or just completed in 2021 or 2022. Numerous private-sector real estate projects are underway throughout the city.
0 Comments
Read More
Leave a Reply. |